In development

The gas conditioning suite

Screening-level sizing and budget cost estimates for compressor stations, amine units and TEG dehydrators. It is built from the design workbooks we use on client projects.

Enter the gas once. Size the whole train.

Enter composition, flow, pressure and temperature a single time. Each module uses the same inlet gas, so compression, treating and dehydration stay consistent with each other.

Compressor station

  • Stages, horsepower and driver selection
  • Discharge temperatures and cooler duty
  • Station capital cost estimate

Amine unit

  • Amine selection and circulation rate
  • Contactor and regenerator sizing
  • Reboiler duty and unit cost estimate

TEG dehydration

  • Water content and dew point targets
  • Glycol rate and contactor sizing
  • Regenerator duty and unit cost estimate

Who it is for

Facilities engineers, small operators, consultants and deal teams who need a defensible first answer before committing to a full simulation or a vendor quote.

Results are screening-level estimates for planning. They are not engineering services, are not sealed by a licensed professional engineer, and do not replace detailed design by one.

Join early access

Early users get free access during the beta in exchange for feedback. Email us your name, company and the module you would use most.

Request early access

Or write to contact@hillcountrymidstream.com.